Wednesday, October 26, 2005
Monday, October 17, 2005
Flawed Process and Incomplete Plans
1. There apparently has been nominal input from the teachers and nearly no input from the parents or students. Do the current plans represent a draft final version? Were other options explored? Why was only one option shown to the public? Why were the key stakeholders (parents and teachers) largely left out the process to this point and why was there not a meeting with stakeholders to discuss goals and explore opportunities and to develop options before designing a plan? According to minutes from the Cheltenham United Parents Group meeting on 2/9/05 "Hayes Large will organize a public forum for teachers, parents and the community at large to gather input and ideas." As far as I know, this public forum never occurred.
2. Why have the goals not been clearly explained to the public? A one-sheet document next to the plans explaining the goals, needs and anticipated costs would have placed the plan in some sense of context.
3. The plans are severely lacking in terms of presentation. No site plan was shown to place the building on the entire property. The plan did not include dimensions of rooms only square footage. The plan did not show property lines. There were no elevations (side views of the building) shown to help understand massing and use of materials. There was no presentation of (or notes on) materials to be used or any discussion of what proposed work is planned in terms of HVAC, ADA issues, or changes or renovations (e.g. new windows) to existing classrooms that are remaining as classrooms. There was no scale on the plan. There was no presentation on changes to landscaping or open space. There was no readily discernable way to identify all of the proposed changes or to compare the proposed changes to the existing structure (an existing floor plan and site plan to compare to the proposed floor plan and a proposed site plan would have been very useful).